From: Poland
Location: Białystok, PL
On Useme since 21 February 2026
About me
I automate data work in Excel and Google Sheets: reports and documents that are still assembled by hand, cleaning and combining data from several files, KPI dashboards, Apps Script apps and process maps.
After a project you get:
• a working file or app built on your data
• a user guide and handover, so your team can work without me
• a note on assumptions, limitations and the tests carried out
To start a conversation, send:
• your current files (anonymised is fine)
• a description of the steps done by hand today
• an example of the result you expect
Experience: process analysis and mapping in manufacturing and freight forwarding (incl. about 1,500 work-time studies and a team that delivered PLN 1.5m in savings within 3 months), a delivery-booking app used by 31 organisations, and currently business software implementation. Portfolio projects are separate demos with fictitious data.
Categories
CV / Résumé
Oct 2026 - Now
Implementation Specialist
Firma IT (wdrożenia oprogramowania)
Rolling out business applications for clients: configuring accounts, permissions and dictionaries, user training, guides and documentation, first-line support, and acceptance testing of changes after updates.
May 2026 - Oct 2026
Consultant
Grot Consulting sp. z o.o.
Workload analysis of over 600 tasks at the head office of an energy company branch: observation of about 150 employees, over 150 work-time reports, improvement recommendations for department heads.
Feb 2026 - May 2026
Programme Coordinator (FEPŻ)
Federacja Polskich Banków Żywności
Built and rolled out my own Google Apps Script web app for delivery booking, used by 31 food banks and 15 suppliers. Distribution data checks and reporting in an EU-funded programme.
Feb 2025 - Feb 2026
Implementation Leader, deputy project director
RPCG sp. z o.o.
Production and dispatch optimisation at a manufacturer with 1,500+ staff: process maps, KPIs, work standards, about 1,500 work-time studies and 800 machine studies. Raw material waste in the analysed area cut from 25% to 5%.
Jan 2024 - Feb 2025
Construction and renovation project coordinator
FOMART Biuro Projektowe
Coordinating renovation and fit-out stages: ordering materials, working with contractors and developers, supervising work stages, handover inspections and measurements.
Portfolio
For a warehouse with several docks: suppliers book a slot and a dock, double bookings are blocked, the gate checks drivers in with a QR code and the daily plan refreshes every 15 s. Apps Script and Google Sheets, fictitious data.
Mapa procesu BPMN: przyjęcie dostawy
Process from booking to goods receipt: 4 roles, 4 decisions, steps inside and outside the app, consistent with the booking demo. A .bpmn file (BPMN 2.0) and a PDF explaining 3 key situations and limitations. Demo, fictitious data.
For a haulage company: contribution margin per order, truck and km, plus a fuel balance (fuel cards vs telematics) that flags trucks to check. Month picked from a list, formulas on tables, a new month is just new rows. Demo, fictitious data.